Third & Harrison

Seattle, Washington

Project Description

The project at 3rd & Harrison was part of a sustainable design by the Architect, Perkins+Will. This was a 450 level BIM project, requiring the shop drawings to be integrated into the building model. Very careful coordination was needed with the glazing contractor, General Contractor, and Architect. AE Dynamics designed all of the stick-build curtain wall, ribbon windows, and entrances, while coordinating with the product manufacturer (Wausau Window and Wall Systems), who designed the unitized curtain wall.

Project Role

Specialty System

Additional Systems

Entrances

Building Type