Project Description
The Canyons School District, is located in Sandy Utah, just south of Salt Lake City. When created in 2009, it inherited nearly $650 in deferred maintenance on its buildings. The aging 55 year old Union Middle School was determined to be more cost effective to rebuild rather than repair. The new $62 million school, which opened in 2023, sits on the site of the old school. It boasts 230,000 sq ft, and consists of four grade specific wings, a 650 seat auditorium, custom athletic spaces, and many upgrades for teaching in an environmentally conscious and digital age. AE Dynamics provided shop drawings for all of the building facade systems. This includes multiple metal panel types, as well as both curtain wall and storefront glazing systems. Additionally, AE Dynamics fully engineered the glazing systems and anchorage of the panel systems.
Project Role
Building Size
230,000 sq ft